1138 Hunters Ct.
Arden Hills, MN 55112-3710
(SW of County Road E and Lexington Ave). Cross Street: Benton Way
Appraisal:
http://www.judgmentcenter.com/1138HunterCtAppraisal04252017.pdf
MLS Listing:
https://www.edinarealty.com/homes-for-sale/1138-hunters-court-arden-hills-mn-55112-4823266#/
Tenant should
be moving out by March 31st or earlier.
Repairs will start after tenant moves out. The house will then be empty.
Scroll down
"↓" for pictures
Timelines:
Cleaning:
Saturday April 1st 04/01/17:
Cleaning
entire house
General repairs:
starting anytime from Saturday
04/01/17 to Monday 04/03/17.
Finishing Thursday 04/06/17
DRYWALL:
starting anytime from Saturday 04/01/17 to Monday
04/03/17.
Finishing Thursday 04/06/17
1st
Week of April: Monday 04/03/17 to Friday 04/07/17
Kitchen
Counter and Sink Upgrade confirmed install
04/03/17 (1 day to complete entire job)
Interior Painting
confirmed
Deliver kitchen/foyer vinyl flooring (will call me on
04/05/17) (deliver on 04/06/17
confirmed)
2nd
Week of April: Monday 04/10/17 to Friday 04/14/17
Vinyl
Flooring: Thursday 04/13/17 (end of 2nd week of April)
confirmed
3rd
Week of April: Monday 04/17/17 to Friday 04/21/17
Carpeting: Monday 04/17/2017 to 04/18/17 (beginning of 3rd week
of April) confirmed
Front Storm Door: Wednesday 04/19/17
NOT confirmed
Staging by Edina Realty: Thursday 04/20/17
NOT
confirmed |
|
Repairs needed:
I
will be trying to sell it as soon as all repairs are done.
1.
Clean the house after tenant moves out.
2.
Replace the front storm/screen door. I have a picture that I
can email you.
3.
The sliding glass door to the deck from dining room's lock is
broken, however it does have an aftermarket deadbolt installed to
make it still lock and be secured..
4.
Several blinds need repaired if possible, or after tenant moves out
I might just have them removed. I have some pictures of them
that I can email you.
5. Kitchen: replace kitchen counter tops (probably Quartz) and
sink.
6.
Kitchen: replace kitchen vinyl floor
7. Replace carpet. (details below).
Lowest price will determine carpet.
8.
Paint walls & ceilings. (details below).
9.
Clean vinyl siding. Do not power wash. Vinyl siding is insulated
vinyl siding. If power washed then water can get behind the siding
and its insulation.
10.
Tub re-calked. (upstairs bathroom)
11.
Drywalling Garage walls and laundry room walls too.
12. Yard work (weeds, raking etc…) House has been landscaped a lot,
but tenant has not done much routine yard work. Lots of weeds are
seen.
13.
Once all repairs are complete and the house is cleaned again, then I
will have it staged with furniture, pictures, plants etc...
15 room house has 5 levels, 4 bedrooms.
Pictures, details:
http://www.allhomebased.com/house.html
It is a rental where the tenant will be moving out 03/31/2017 or
before. I will then be selling the home (MLS listing). I would
like to have the entire house looked at, measured and given an
estimate as soon as it can be scheduled (hopefully in February).
The house will be vacant with a lockbox when the work will be done.
I have a property manager that will meet you there for the estimate.
Text/Calls: 651-321-1801 Landline: 863-256-5646
Email:
steve @ judgmentcenter.com
I prefer emails because I work different hours than most people.
Thank you, Steve Cook
Once
the tenant moves out by 03/31/2017 or earlier there will be a
lockbox on the door and the house will be empty.
PAINTING
MAIN LEVEL
Main
living room (with fireplace)
Next to/attached to the main living room is a dining room.
KITCHEN
TOP LEVEL
Stairway going upstairs (probably 8 steps)
Upper hallway
3 upper bedrooms
Bathroom
LOWER LEVEL (down from Main level)
Stairway going downstairs from main level (probably 6 steps)
Living room (ceiling has dark brown wooden beams)
Bedroom
Bathroom (ice damn repair ceiling/wall)
BASEMENT (down from Lower level)
Stairway going further downstairs from lower level (probably
6 more steps)
Family room
ROOM OFF KITCHEN & GARAGE
Stairway going down from kitchen (probably 1 step)
Family room off garage and kitchen
OUTSIDE
Clean/repaint cement from steps
http://www.allhomebased.com/1138/Outside_front.jpg
CARPET
MAIN LEVEL
Main
living room (with fireplace)
Next to/attached to the main living room is a dining room.
KITCHEN VINYL FLOOR
TOP LEVEL
Stairway going upstairs (probably 8 steps)
Upper hallway
3 upper bedrooms
LOWER LEVEL (down from Main level)
Stairway going downstairs from main level (probably 6 steps)
Living room (ceiling has dark brown wooden beams)
Bedroom
BASEMENT (down from Lower level)
Stairway going further downstairs from lower level (probably
6 more steps)
Family room
ROOM OFF KITCHEN & GARAGE
Stairway going down from kitchen (probably 1 step)
Family room off garage and kitchen
Repairs/cleaning
CLEANING entire house after
tenant moves out
-
"Move Out" Cleaning:
-
Master bathroom (sink, toilet, walls, light
fixtures, 1 tub/shower, shower glass doors)
-
Lower level bathroom (sink, toilet, walls, light
fixture, 1 shower)
-
Kitchen (sink, counters, refrigerator/freezer, built
in microwave, oven/stove, dishwasher)
-
Clean kitchen floor
-
Laundry room (floor is very dirty)
-
Garage floor (sweep and a little cleaning of cement
floor to make it look presentable)
-
Baseboard cleaning in every single room
-
Mold
on window sill in lower bathroom (has some mold from
shower condensation)
-
Vacuum carpet (4 living rooms, 22 steps, 4 bedrooms,
2 hallways, part of 1 bathroom)
-
Furnace room cleaning
-
Window Glass Cleaning the inside and outside of all windows
-
Window sill cleaning of all window sills
DRYWALL
-
Garage
walls:
-
Add
new drywall: One side wall only has studs and
insulation (want to have drywall added)
-
Add
new drywall: Areas around the garage door only has
studs and insulation (want to have drywall added)
-
Taping/Finishing drywall: Two other walls of garage
(front wall next to house and near fireplace both
already has drywall (needs taping/finishing)
-
Garage YouTube video link:
https://www.youtube.com/watch?v=8AgngqI9KRo
-
Laundry
room:
-
Drywall repair in laundry room
General
repairs:
-
Lower bathroom towel
rack repair (probably replaced
after painting is completed)
-
Lower bedroom closet
door damage or just re-hang.
-
Upstairs tub & it’s glass shower door re-calked as
needed
-
Two bathroom sinks re-calked as needed
-
Possible damage on
doors. Lower bedroom door has
LOTS of stickers and there might be damage to the door
when they stickers removed.
-
Lower bedroom
ceiling lamp fixture.
-
Blinds in several
rooms damaged.
-
Mold on lower
bathroom window sill.
-
Install new front
storm door (will be done 04/25/17 or 04/26/17 or after all
other work is done)
|
Blind repair |
Blind repair |
Blind repair |
Blind repair |
Blind repair |
 |
 |
 |
 |
 |
Towel rack repair |
office closet door |
lower bathroom shower |
lower bathroom window sill mold |
 |
 |
 |
 |
Click thumb nail for larger picture:
|